10.10.2 Work Authorization

Formal authorization should be used where the work, exposure conditions, or shared responsibilities make it necessary to confirm that the prerequisites have been satisfied.

Depending on the nature of the work, this may involve:

The authorization is a control, not a paperwork exercise. It should identify the work and its limits, the approved source states and controls, the people authorized to act, the validity period, the communications and stop-work conditions, and the formal release or handback required before restoration.

10.10.3 Pre-Work Briefings

A pre-work briefing should confirm:

At a shared site, the briefing should confirm that the Responsible Person, source owners or operators, supervisors, and contractors are using the same current information and have agreed who may change or restore each source.